For the trade

Asbestos siding removal for contractors, flippers and landlords

Burnt Bridge Siding Removal is the removal sub for projects that cannot legally do it themselves: rentals, flips, houses under contract, multifamily and commercial buildings in Vancouver, Clark County, and up the freeway to Longview.

Call (360) 838-1233

If the house is not owner occupied by the person doing the work, Washington requires a certified asbestos abatement contractor to remove cement asbestos siding, and the Southwest Clean Air Agency notice carries a 10 day wait and a $384 fee for nearly every house. We run that whole piece as a subcontract: the lab sample, the notice, the certified crew, the landfill, and the manifest, so your siding crew starts on a bare wall the next morning and your file has the paperwork a buyer or a lender will ask for.

Who this page is for

The law, as it applies to you

The owner occupant exemption that lets a homeowner pull their own siding for a $39 notice is defined narrowly: a single family residence the owner lives in before and after the work. The agency’s own guidance excludes rental property, multifamily, mixed use, commercial, property management, real estate transactions, and ordered demolition by name. For every one of those, the removal must be performed by a contractor certified by Washington Labor and Industries, and a written good faith asbestos survey has to be on site before any trade starts work that could disturb the material. The fines run up to $600 per day for the survey alone, and higher if workers are exposed.

How we fit into your schedule

  1. Send the address at award. We measure from the record and send a written range within hours.
  2. We sample, or you send us the survey if one exists. Results in two to five days.
  3. We file the SWCAA notice. The 10 day clock starts.
  4. Removal in one to three working days, one elevation at a time if the building is occupied.
  5. Bare wall swept, plastic gone, bags on the trailer. Your crew starts the next morning.
  6. Lab report, notice and waste shipment record as PDFs to whoever you name, within the week.

Pricing for the trade

The ranges on the cost guide are the ranges you get. A one story ranch with 1,000 to 1,500 square feet of siding is $6,500 to $12,000, a two story house $14,000 to $26,000, a duplex or small multifamily $24,000 to $50,000, all including the notice fee and disposal. What we add for repeat work is speed on the quote and priority on the calendar, not a different number.

Multifamily and commercial

Occupied buildings get staged elevations, posted notices at every entry, and a crew lead who talks to the tenants. Commercial buildings and anything headed for demolition need the full AHERA survey, which we arrange through an accredited inspector on the agency list. Projects that cross 5,000 square feet on one notice step the fee to $765, and we tell you where that line is before filing.

What we need from you

What GCs and investors ask us

Can my siding crew remove the transite if we wet it and bag it?
No. Washington allows only a certified asbestos abatement contractor to remove asbestos containing material for pay, regardless of method. A siding crew doing it risks L&I citations for the crew and the GC, and leaves the owner with no manifest at sale time.
How much lead time do you need?
Fourteen days minimum from the lab result, because the SWCAA notice carries a 10 day wait and we file only with a result in hand. Give us the address when the job is awarded and we will have the clock running before your crew is scheduled.
Do you give contractor pricing?
We give the same per square foot ranges published on the cost guide to everyone, and we quote repeat work the same day. What a contractor gets that a homeowner does not is scheduling priority and a direct line to the crew lead on the day.
Who gets the paperwork?
Whoever you name. Typically the owner gets the lab report, the notice, and the waste shipment record, and the GC gets copies for the job file. We send PDFs within the week.
We have a rental with tenants in it. Can you work around them?
Yes. Exterior removal does not require the unit to be empty. We stage one elevation at a time, keep entries clear, post the notice, and tell the tenants what is happening and when. Occupied multifamily adds staged days to the schedule, which is in the quote.
What about an inspector showing up?
Expected and fine. The notice is posted, the material is wet, the ground is plastic, the bags are labeled, and the crew is certified. We have never had a job stopped, and we would rather an inspector see it done right than hear about it from a neighbor.

Send the address, get the number

Pick the removal before new siding option or the rental and multifamily option and we will quote it today.

4 siding jobs are still open on this month's calendar. The 10 day SWCAA wait starts the day we file.

Get a written price(360) 838-1233